The Power Supply Upgrade (PSU) project carried out by Network Rail over the past three or four years has truly been on a grand scale. It was the largest electrical supply project in Europe at the time and the biggest electrification project in Britain’s railways for well over 50 years, costing over £500 million.
One of the projects where 3M Cold Shrink tubes have been used for this cable protection application in on the Rhyl Flats wind farm in the Irish Channel.
Quick Links
For information on costing, availability or specifications on 3M Electrical Supplies feel free to get in touch.