3M uses cookies on this site Detailed information on cookies and their use can be found in our Privacy Policy. You can customize the cookie-related settings at any time by clicking on Cookie Preferences in the footer of this page.

By clicking "Accept and Proceed" you acknowledge that you agree to the use of cookies on your computer

Accept and Proceed

Skip to Primary Navigation Skip to Site Navigation Skip to Main Content All 3M.com Site Map

Electrical Supplies

Market Solutions
Videos & News
Customer Services
Solutions for the Rail Industry

Case Studies

Despite being one of the most challenging rail projects of recent times, High Speed 1 - the 68 mile link from the Channel Tunnel to London previously known as the Channel Tunnel Rail Link - is on schedule to come into full passenger service on 14 November 2007
 High Speed 1 is on track with 3M
The Power Supply Upgrade (PSU) project carried out by Network Rail over the past three or four years has truly been on a grand scale. It was the largest electrical supply project in Europe at the time and the biggest electrification project in Britain’s railways for well over 50 years, costing over £500 million.
 The Inside Track on Network Rail’s PSU project
The use of the 3M Cold Shrink as part of WCML’s auto transformer feeding system is expected to allow Network Rail a saving of £3 million compared to traditional methods.
 WCML gets up to speed with 3M Cold Shrink